Project 1 Industrialized Building System (IBS)

This is a group assignment that assigned us to design, visualize and built a apartment by using IBS method. We are also required to calculate the embodied energy of the building material along this project to show our understanding.




Reflection:


This project is fun but the time that given is a little bit tight as there are so many submission on going but the overall progress and outcome is doing well and i am glad to be team with my team mate which they contributes alot in this project.


Project 2 Construction Solutions

In this project, is it divided into two different part where Part A consist of case study and Part B in the integration with Architectural Design Studio V final project by providing construction solution implementing the case study and producing sectional perspectives.



Reflection:


I had learn alot in this project, from the preliminary design stage of the design I did case study to understand the site context especially the environmental impact towards the facade. Hence, I research case studies related to the similar site context regarding of the preliminary design stage of the design studio to propose the facade for my library.