Project 1 Industrialized Building System (IBS)
This is a group assignment that assigned us to design, visualize and built a apartment by using IBS method. We are also required to calculate the embodied energy of the building material along this project to show our understanding.
Reflection:
This project is fun but the time that given is a little bit tight as there are so many submission on going but the overall progress and outcome is doing well and i am glad to be team with my team mate which they contributes alot in this project.
Project 2 Construction Solutions
In this project, is it divided into two different part where Part A consist of case study and Part B in the integration with Architectural Design Studio V final project by providing construction solution implementing the case study and producing sectional perspectives.
Reflection:
I had learn alot in this project, from the preliminary design stage of the design I did case study to understand the site context especially the environmental impact towards the facade. Hence, I research case studies related to the similar site context regarding of the preliminary design stage of the design studio to propose the facade for my library.
This is a group assignment that assigned us to design, visualize and built a apartment by using IBS method. We are also required to calculate the embodied energy of the building material along this project to show our understanding.
Reflection:
This project is fun but the time that given is a little bit tight as there are so many submission on going but the overall progress and outcome is doing well and i am glad to be team with my team mate which they contributes alot in this project.
Project 2 Construction Solutions
In this project, is it divided into two different part where Part A consist of case study and Part B in the integration with Architectural Design Studio V final project by providing construction solution implementing the case study and producing sectional perspectives.
I had learn alot in this project, from the preliminary design stage of the design I did case study to understand the site context especially the environmental impact towards the facade. Hence, I research case studies related to the similar site context regarding of the preliminary design stage of the design studio to propose the facade for my library.
Sunday, 17 July 2016
Building Science 2
11:18
No comments
Project 1 : Lighting and Acoustic Performance Evaluation and Design
Report:
Boards:
Project 2 : Integration with Architectural Design Studio V
Report :
Boards:
Report:
Boards:
Project 2 : Integration with Architectural Design Studio V
Report :
Boards:
Subscribe to:
Comments (Atom)